ES | CN

ETA approved NJMKT anchors

+86 025 8665 1110
Home >> News

The role of the pre-buried channel of the pipe gallery

Dec. 05, 2018


The integrated pipe gallery is a municipal infrastructure that can accommodate a variety of underground pipelines such as electricity, communications, water supply and drainage, and heat. The construction of the pipe gallery is inseparable from the participation of the pre-buried channel of the pipe gallery. At present, the scale of the construction of the integrated pipe gallery has become one of the important signs of the modernization level of urban infrastructure construction. It is the comprehensive carrier of the urban municipal pipeline. Here, it is possible to realize the intensive, unified, and standardized construction and management of various pipelines. So what role does the pipe gallery pre-buried channel play in the urban city integrated pipe gallery?

 

20181130152657_8462.jpg


First of all, we need to know the composition of the city's integrated pipe corridor. Domestic and foreign countries have roughly the same types of pipelines (pipes) included in the integrated pipe gallery. The domestic integrated pipe gallery is laid with general pipelines (pipes). Generally, these pipelines and pipings have integrated two or more types of municipal pipelines, such as electricity, communication, gas and water supply.

 

Therefore, the role of the pre-buried channel of the pipe gallery is to integrate these pipelines into one, following the principle of pipe arrangement: “The part submits to the whole; the small pipe submits to the large pipe; the soft pipe submits to the hard pipe, and the one with pressure submits to the one without pressure.” The layout principle of the intersection: "The pressure pipe submits to the gravity pipe; the small pipe diameter submits to the large pipe diameter, and the branch pipe submits to the dry pipe." Let all the pipelines have a place. In addition, the integrated pipe gallery pre-buried channel has a safe anti-shock, anti-shock and anti-slip performance. It is modular installation and has simple process and stable quality. This is also convenient for future maintenance and commissioning.


20181101142830_1701.jpg


As the appearance of the pipeline pre-buried channel, in the existing floor space, the rational use of the underground space resources of the city is equivalent to increasing the available area of the city by half of the existing footprint. This has solved the problem of tight land resources and improved the utilization rate of land. It is of great significance for expanding the development and utilization of the city. If you are interested in this product, please call our one-stop service hotline: 400-894-5118.

 

Link to this article: https://www.njmkt.net/Article/glymcddzy.html

(Editor: Nanjing Mankate, if you need to reprint, please indicate the source)